Got a problem here in that I have a large concrete detention vault on piling to design on a site that could see 18 to 24" of long term settlement.
Does anyone have any flexible connection details for stormwater pipe into and out of the vault, plus water and sewer for the same situation, that they could share?
Any input would be appreciated. Thanks all.
Mike McCann
MMC Engineering
Does anyone have any flexible connection details for stormwater pipe into and out of the vault, plus water and sewer for the same situation, that they could share?
Any input would be appreciated. Thanks all.
Mike McCann
MMC Engineering