asnyde92
Civil/Environmental
- Feb 22, 2003
- 8
I am wondering what the best way to calculate backfill quantites for a trench, clay site with utilities under a road, I would assume that the side slopes would have to meet some standard and that also a box may affect the situation at some depth. I'm looking for a cubic yardage per lineal foot based on any particular depth.