CP7
Mechanical
- Nov 21, 2012
- 5
I have some experience with pipeline projects, so I directed my focus to be towards improving some aspect of pipelines.
My focus is studying the rolling technique for faster installation below ground, and looking at ways to save costs while doing it. I have had some good progress with studying various pipeline material's characteristics, bending limits, joining types, and installation techniques.
I am finding that some areas are still very shallow for analysis and I am finding a hard time in researching relevant codes, requirements, or common practice techniques for trench planning. While areas like bedding, angle of repose, class location, burial depth, and backfilling seem to be readily available, I am coming up short on finding out how to properly plan the lateral distance of the joined pipeline on stands to the trench's edge (sounds like it may have a safety requirement), sideboom's lifting limits, and sideboom's sling with rollers' common dimensions.
I have access to some ASTM and ASME libraries, as well as Pipeline Design and Construction by M. Mohitpour. I think that the majority of what I am missing is for construction planning in regards to trench, ROW, and sideboom planning.
Can anyone please point me in the direction if there are any available resources to learn more about these topics?
Thank you in advance and I welcome any input of any type,
Cole
My focus is studying the rolling technique for faster installation below ground, and looking at ways to save costs while doing it. I have had some good progress with studying various pipeline material's characteristics, bending limits, joining types, and installation techniques.
I am finding that some areas are still very shallow for analysis and I am finding a hard time in researching relevant codes, requirements, or common practice techniques for trench planning. While areas like bedding, angle of repose, class location, burial depth, and backfilling seem to be readily available, I am coming up short on finding out how to properly plan the lateral distance of the joined pipeline on stands to the trench's edge (sounds like it may have a safety requirement), sideboom's lifting limits, and sideboom's sling with rollers' common dimensions.
I have access to some ASTM and ASME libraries, as well as Pipeline Design and Construction by M. Mohitpour. I think that the majority of what I am missing is for construction planning in regards to trench, ROW, and sideboom planning.
Can anyone please point me in the direction if there are any available resources to learn more about these topics?
Thank you in advance and I welcome any input of any type,
Cole