We are looking at the design of a Tailings Dam - also called a slimes dam, residue dam, or mine dump. It is proposed as 500 m diameter x 50 m high.
I have been told that Tailings Dams collapse at heights in excess of 30 m. The difference betwen an earth-fill dam, and a tailings dam is that earth-fill dams are designed to retain full depth of water, while tailings dams are huge settling ponds which are designed to silt up.
Does anyone have some guidelines on the design of high Tailings Dams?
I have been told that Tailings Dams collapse at heights in excess of 30 m. The difference betwen an earth-fill dam, and a tailings dam is that earth-fill dams are designed to retain full depth of water, while tailings dams are huge settling ponds which are designed to silt up.
Does anyone have some guidelines on the design of high Tailings Dams?