What is the best way to go about designing a structural section for an asphalt pad in desert conditions for a staging area for equipment?
We have a good subbase as soils are sand. Design will need to conform to H20 loading. There will be some heavy process equipment located on the pad so we could have point loads on asphalt from equipment stands. Heavy tractor trailers will utilize the site. The site will only be in use for 6-7 months.
We have a good subbase as soils are sand. Design will need to conform to H20 loading. There will be some heavy process equipment located on the pad so we could have point loads on asphalt from equipment stands. Heavy tractor trailers will utilize the site. The site will only be in use for 6-7 months.