CeaserMech
Mechanical
- Aug 21, 2009
- 9
I am working on an engineering design which includes underground piping.
We're having the contractor dig a 4' trench, fill 6" deep sand, then verify it is at a certain compression value.
Then they lay the pipes and surround the pipes with sand and again verify their compression value.
Finally they fill with Native soil to the top of the trench and again verify the compression value.
The goal is to make sure that over time (with rain and walking) the trench wont sink down.
Where can I find out good compression values to use for the sand and soil?
We're having the contractor dig a 4' trench, fill 6" deep sand, then verify it is at a certain compression value.
Then they lay the pipes and surround the pipes with sand and again verify their compression value.
Finally they fill with Native soil to the top of the trench and again verify the compression value.
The goal is to make sure that over time (with rain and walking) the trench wont sink down.
Where can I find out good compression values to use for the sand and soil?