An architect wants a 1/2" recess in the slab on metal deck to accommodate carpeting. Current slab is 5-1/2" total (3-1/2" over 2" deck) I don't have a fire rating requirement for the floor so the question is if they can reasonably cast the depressed area and we can have a thinner structural slab in those areas.
The areas don't relate well to the floor framing so any direct drop/step in the total slab would be awkward.
I also struggle to see how they would try and construct a small depressed zone within the pour without construction joints at that interface. Is there a way for this construction to be placed in one operation?
The areas don't relate well to the floor framing so any direct drop/step in the total slab would be awkward.
I also struggle to see how they would try and construct a small depressed zone within the pour without construction joints at that interface. Is there a way for this construction to be placed in one operation?