Icecoffee
Mechanical
- Mar 12, 2007
- 14
Hi all,
I am in process of designing a chilled demin water system and with some specs here:
Approx 1300 GPM, transient heat load: 10MJ, requirement is provide chilling capacity to dissipate 10MJ within 10 minutes. The design chilled demin water temperature is 50F.
I am thinking having a separate loop for cooling and another separate loop for resin bed (I plan to buy demin water to start and keep "re-cleaning" it along the way). I would like to ask for advise from all of you... about the feasibility of this setup and how to size the bed... and other pointers. THANKS!!!!!!
I am in process of designing a chilled demin water system and with some specs here:
Approx 1300 GPM, transient heat load: 10MJ, requirement is provide chilling capacity to dissipate 10MJ within 10 minutes. The design chilled demin water temperature is 50F.
I am thinking having a separate loop for cooling and another separate loop for resin bed (I plan to buy demin water to start and keep "re-cleaning" it along the way). I would like to ask for advise from all of you... about the feasibility of this setup and how to size the bed... and other pointers. THANKS!!!!!!