ceseng
Civil/Environmental
- Dec 6, 2008
- 12
For example, I have a subdivision, it has a master meter, the monthly bill showed 72,000 gallon per day, that equals to 50 gpm average flow.
There is a internal water network inside the subdivision, how can I allocate the 50 gpm to the nodes? the WaterCAD book introduces me to use GIS spatial analytical tools.
Can you guys introduce me what GIS software works fine for the task?
Can I allocate the demands without GIS?
Thanks.
There is a internal water network inside the subdivision, how can I allocate the 50 gpm to the nodes? the WaterCAD book introduces me to use GIS spatial analytical tools.
Can you guys introduce me what GIS software works fine for the task?
Can I allocate the demands without GIS?
Thanks.