inaz
Civil/Environmental
- Jun 3, 2003
- 26
An existing buildng will be razed for a new 4-storey structure. There is an adjacent building with a zero setback distance. The upper 15 to 20 feet of soils are loose to medium dense old fill soils, underlain by a very dense clayey sand stratum. The bottom level will be a parking garage (slab-on-grade).
The existing structure is seated on the upper less quality soils with shallow foundations. The site is downtown along the main business district, so staging area is very limited. I plan on recommmending drilled cast-in-place piers. To limit haul off, I've looked at displacement flight auger piles. Any helpfull suggestions?
The existing structure is seated on the upper less quality soils with shallow foundations. The site is downtown along the main business district, so staging area is very limited. I plan on recommmending drilled cast-in-place piers. To limit haul off, I've looked at displacement flight auger piles. Any helpfull suggestions?