mshemy
Civil/Environmental
- May 21, 2015
- 5
is it possible to backfill & compact a depth of 6-8m and then build the footing?
i have a problem in my project, the new received site, the site level have some area levels is lower than the excavation level by 6 to 8m.
is there any methodology supported by international codes ref. such ASTM describe this case.
Please support.
i have a problem in my project, the new received site, the site level have some area levels is lower than the excavation level by 6 to 8m.
is there any methodology supported by international codes ref. such ASTM describe this case.
Please support.