athilatt
First off, you have double posted in the ASME Code forum. So, to conform with site rules here is the cross post link.
thread292-251346
Now in response to your question, this is a contractual matter between the manufacturer and the client, and not a code of construction matter. If it was me, and I had a detailed engineering specification when I sent out my request for proposals, it would probably have language that mentions no physical or mechanical damage during handling or shipping.
This means - no fin damage period.