living2learn
Electrical
- Jan 7, 2010
- 142
I am helping a facility out and noticed that they had a secondary spot network with the fault contribution around 75,000A symm. They have a homemade tap box (no ul listing, field fabricated with bus bars with very small standoffs). Does this box need a ul listing and be properly braced for the fault current it could recieve?