Actually I'm represent the client. We deal with the EPCC (Engineering,Procurement,Construction,& Commissioning) Contractor. It is a lump sum contract. The contract is between client and EPCC Contractor. The gas turbine package is supplied by GE/NP which is under EPCC Contractor. The package includes the generator which is manufactured by Brush.
The foundation is designed by the EPCC contractor and they are 110% confident with the design. Technically, GE/NP has got no problem. Only Brush, the generator supplier has some concerns regarding the foundation design.
It is still under discussion, but most likely we may proceed with the EPCC Contractor's design i.e. low tune design....