SteelPE
Structural
- Mar 9, 2006
- 2,759
I have a client who is asking me to design a concrete head wall and footing for a Contech aluminum culvert. I am a little surprised that there are no "typical details" for the design of the head wall. I understand the forces involved but what I do have questions about is whether or not the footing for the culvert needs to be founded below frost elevation.
We have asked Contech about this only to get mixed answers. They swayed us towards providing a footing below frost depth but did so reluctantly.... basically saying "if you think it should then we agree". The civil engineer is not giving much help either.
Should the footing for the culvert be placed below the frost elevation for the local jurisdiction? What do others do in this situation.
We have asked Contech about this only to get mixed answers. They swayed us towards providing a footing below frost depth but did so reluctantly.... basically saying "if you think it should then we agree". The civil engineer is not giving much help either.
Should the footing for the culvert be placed below the frost elevation for the local jurisdiction? What do others do in this situation.