Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations JStephen on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

CSA Z662 pipeline code hydrotesting requirements and hold times

Status
Not open for further replies.

SBose1990

Mechanical
Joined
Jun 22, 2016
Messages
1
Location
CA
thread378-247995

There are two category of pressure testing according to CSA Z662.
Operating pressure greater than 700 KPa and operating pressure less than or equal 700 KPa.
For operating pressure greater than 700 KPa an additional mandatory test called strength testing is required along with hydro testing. The strength testing pressure is provided in table 8.1 of CSA Z662. For example, class 1 pipeline strength test pressure is 125% of MOP or 1.25 of MOP. The hold time is 1 hour. After the strength testing, an optional hydrotesting is required. The hydro test is required only if any of the component of piping is not visible for the inspector to detect leak for example under insulation etc. The hydrotesting pressure is provided in table 8.1 and is 110% of MOP for class 1 LVP pipe. The hold time is 4 hr for liquid testing medium and 24 hours for gas testing medium leak test/ hydro test.