Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations LittleInch on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Critical path

Status
Not open for further replies.

davidyu2404

Mechanical
Joined
Jul 23, 2015
Messages
11
Location
US
I am a little bit confused on this: After pressure balance by design, how could there be a critical path (since all paths have the same pressure loss now)? I am designing a local exhaust system and each path starts from the terminal to the exhaust fan.
 
Critical path is the one with balancing damper all open if they did it right.

All paths will have equal pressuredrop - no matter what. Problem is, this is not the flow you want. So you use dampers to reduce the flow while keeping pressure the same in all runs.
 
Critical path is usually but not always the longest run.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top