Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

CPT Pore Pressure

Status
Not open for further replies.
The equilibrium pore pressure is typically determined by pore pressure dissipation tests just below the inferred phreatic level, this is not shown in the typical CPT plot. Pore pressure dissipation tests measure the equilibrium pore pressure at the depth tested. Pore pressure dissipation plots are provided as separate file to indicate the depth of the test, the time interval and the pore pressure reading. Looking at your attached picture I can find at least two tests were completed, the first being between the first and second dashed lines and another between the 6 and 7 dashed lines.
 
Not sure if this is what you are asking for but my understanding is that the pore pressure measured during CPT is the shear-induced pore pressure during the test. So, you may need some piezometers to measure the in-site pore pressures. Plot the hydrostatic pressure (u=gamma water x depth) and compare it against the piezometer measurements. If the measured pore pressures are close to the hydrostatic pressure line, you may consider that the pore pressures are in equilibrium. This may be helpful to see if consolidation is on-going (measured pore pressures higher than hydrostatic pressures) or if consolidation is nearly to completion (measured pore pressures close to hydrostatic pressures).
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top