Mar 3, 2006 #1 georay Geotechnical Joined Feb 28, 2006 Messages 4 Location LV Is there a criterion for the maximum I.D. of a casing if CPT testing (GEOTECH electric cone) has to be done below the bottom of a drill hole?
Is there a criterion for the maximum I.D. of a casing if CPT testing (GEOTECH electric cone) has to be done below the bottom of a drill hole?