REGRUMBLE
Structural
- Jan 28, 2003
- 97
We are building a clad pressure vessel and the customer wants us to do a copper sulfate test where the clad surface has been removed for weld prep to check for clean base metal. Does anyone have a procedure or information on the procees to do this.