Yihan
Structural
- Oct 13, 2011
- 15
I'm doing a box culvert under the railway with ballast/subballast of 600mm above top of the culvet, AREMA part 16 gives an equation to get the dead load (attached), dose it include all Dead Load?
Thanks
Thanks