Dear Bill,
Although I am sure that MJC has conveyed Excellently all about the issue.I would add that lots of foreign materials, process systems leakages find their way into this basin and effective space availability for utilization decreases over a period of time.
Thus ensure easy clean-out and sludge/ filth removal capablities in design.
Moreover the Cooling Water; As I understand is really heart of Process safety catering for most of the system's cooling ,controling the temperatures& pressures.We must give this top priority.
Best Regards
Qalander(Chem)