Well, apparently the water in the area is of a very poor quality, and even with a professionally recommended water treatment plan the last boiler corroded out in a short 11 years.
It has been two years since this replacement, and the water situation has reportedly gotten worst, to the point where to keep conductivity under control 4 blow downs per day are required.
My initial reaction is the system must be leaking like crazy somewhere to require enough feed water to raise the conductivity so fast, however the building operators indicate this is not the case and the water is just that bad.
I am going to inspect the system next week to check on this.
Given all of the above, the conversion question was raised as being a possible solution.
Personally I would like to see the system fixed rather than a conversion, but if the water is that bad and if the operators push enough for it, the conversion will happen.
Altering the rads and piping I can handle, it is just the actual boiler part I an not familiar with.