KCRatnayake
Structural
- Apr 29, 2006
- 89
I have to solve above specific problem at earliest. Client is going to build a highrise building 5m away from his 7-storeyed existing building. His prime requirement is to keep the vibration level at 0.1g as he's having some delicate communication equipment inside the existing building.
Piling contractors indicated me that this is not possible during rock socketing. Can you please guide me to solve this problem? Details are given below.
Depth to rock = 17m
Pile diameter = 1800mm
Location = Sri Lanka
Thanks,
Clefcon
Piling contractors indicated me that this is not possible during rock socketing. Can you please guide me to solve this problem? Details are given below.
Depth to rock = 17m
Pile diameter = 1800mm
Location = Sri Lanka
Thanks,
Clefcon