uu78hswang
Chemical
- Jan 6, 2011
- 24
Dear Sir
I am sorry to bother your this trivial.
I would like how to set the upstream control valve OP
(Please see the attached excel file)
The control valve TV-B upstream is set 7 barg (refer from CV
datasheet), but from its upsream product cooler datahseet, I only
got 5 barg. It seems quite odd to me, and I wonder how the
temperd water recirculation pump suciton presure 3barg get
involved in this valve upstream pressure 7 barg result.
And why is the PCV byapss the TV-B, how is this PCV function if
TV-B fail, and why is no any block valve upstream / downsream of
this TV-B and PCV?
Thank you so much for your kindly help.
I am sorry to bother your this trivial.
I would like how to set the upstream control valve OP
(Please see the attached excel file)
The control valve TV-B upstream is set 7 barg (refer from CV
datasheet), but from its upsream product cooler datahseet, I only
got 5 barg. It seems quite odd to me, and I wonder how the
temperd water recirculation pump suciton presure 3barg get
involved in this valve upstream pressure 7 barg result.
And why is the PCV byapss the TV-B, how is this PCV function if
TV-B fail, and why is no any block valve upstream / downsream of
this TV-B and PCV?
Thank you so much for your kindly help.