Deadblow
Structural
- Jul 13, 2015
- 141
All,
I thought for sure that I recently read a thread on eng-tips that talked about specific codes listing what the contractor is required to submit to the engineer of record. For the life of me, I can't find what I am looking for. I am specifically interested in any code references in the U.S. that state any circumstances where a contractor is required to submit a design to the EOR for approval/rejection. This seems a little backwards to me. Thanks!
EIT
I thought for sure that I recently read a thread on eng-tips that talked about specific codes listing what the contractor is required to submit to the engineer of record. For the life of me, I can't find what I am looking for. I am specifically interested in any code references in the U.S. that state any circumstances where a contractor is required to submit a design to the EOR for approval/rejection. This seems a little backwards to me. Thanks!