If I had a lot of beams I would probably use a elevation of beam conditions with a schedule having a dimension string until developement length starts, say le, then the developement length dimension string labeled ld. I then would also have a table of developement lengths for the bars based on f`c, with a table for 2-1/2" cover or more, and less than 2-1/2" cover, that have ld, 1.3 ld, 2.0 ld, and ldh.