Thanks for the input
jhoulette: Typically the floor truss press cannot go over 3 1/2"; so what if the exterior wall is 2X6 @ 16" O.C. studs? Just matching the 16" O.C. studs on your continuous bearing truss (2X4)will suffice?
msquared: If you have units next to each other and the unit seperation wall is load bearing and the trusses are running width wise, you will need a CB(continuous bearing) truss or knee wall on the exterior wall. Normally GC uses pre-cut studs to frame the wall, so building a full height wall is not used for economic reasons.
Is there any codes or literaturs or information on the stud spacing? If the exterior wall is 2X6 @ 16" O.C. and if it is a 3 floor apt. building.