Mbrooke
Electrical
- Nov 12, 2012
- 2,546
What type of gas partitioning do I want for a GIS substation where I can replace any bay or remove any partition without shutting down the whole substation?
Most "off the shelf" GIS designs require that the entire gear be shutdown for bus or isolater repairs.
Also, under the IEC, when I'm repairing a gas partition do I need to depressurize the neighboring partition like I do under the IEEE?
I need pointers on specking a design that must ABSOLUTELY remain in service for any reasonable repair.
Most "off the shelf" GIS designs require that the entire gear be shutdown for bus or isolater repairs.
Also, under the IEC, when I'm repairing a gas partition do I need to depressurize the neighboring partition like I do under the IEEE?
I need pointers on specking a design that must ABSOLUTELY remain in service for any reasonable repair.