Hello
We are proposing Contiguous Bored Pile walls as retaining earth for Highway schemes.I was wondering how to hold the soil between the piles.Is there any minimum spacing criteria between the piles so that soil mass is stabilised.What are the drainage arrangements to be proposed in case there are rise in GWT/local inflow due to runoff occurs?
Thanks and Regards
Debasis
We are proposing Contiguous Bored Pile walls as retaining earth for Highway schemes.I was wondering how to hold the soil between the piles.Is there any minimum spacing criteria between the piles so that soil mass is stabilised.What are the drainage arrangements to be proposed in case there are rise in GWT/local inflow due to runoff occurs?