Schneidly
Structural
- Jun 9, 2010
- 19
I am in charge of the construction management of a 35ft x 111ft water containing structure. The bottom slab is 43.5ft x 119.33ft with 2 keyed, water stopped construction joints at third points of the length. The client wants a continuous poured slab. He states they did an aeration basin in a continuous pour and thinks there will be more leakage with jointed slab. I have always done “square pours” with joints spaced at 50ft or so. I have been look at code recommendations and the older codes give more strict recommendations than the more current ones. Does anyone have a reference I can refer to when I say “because I am the engineer and I say so”?
attached is a plan view and a couple sections
attached is a plan view and a couple sections