Design calls for a 30" HDPE pipe that outfalls to a storm water pond with a 5:1 side slope. The top of pipe is approximatley 3ft below the control elevation of the pond. The end treatment called for is a cast in place Mitered End Section.
The contractor neglected to install/construct the MES when the pond was dewatered.
Can the MES be installed properly underwater? My biggest concern is not being able to compact the area where the MES will sit.
Any construction suggestions appreciated.