NADOR123
Structural
- Apr 3, 2007
- 49
Hi everyone,
During the construction of Sewage treatment plant building foundation, about 15 old leaching pools have been found during the excavation. The leaching pools bottom elevation is about 8 feet deeper than the bottom elevation of the tanks bottom slab. Some of the leaching pools are in the middle of the foot print of the building and will e completely removed but four pools are near the edge of the foot print (about 4'away).
Is it acceptable to remove the top section of the four pools and fill it up with compacted fill and do we need field test to verify the proper compaction below the bottom slab of the STP building.
Thank you for your help.
During the construction of Sewage treatment plant building foundation, about 15 old leaching pools have been found during the excavation. The leaching pools bottom elevation is about 8 feet deeper than the bottom elevation of the tanks bottom slab. Some of the leaching pools are in the middle of the foot print of the building and will e completely removed but four pools are near the edge of the foot print (about 4'away).
Is it acceptable to remove the top section of the four pools and fill it up with compacted fill and do we need field test to verify the proper compaction below the bottom slab of the STP building.
Thank you for your help.