BigH
I called a local precaster that produces New Jersey style concrete barriers to the State of Illinois DOT Spec. He said they use a mix design that requires a 28 day strength of 4,500 psi. The barriers they cure in the forms (not steam cured) are stripped in two days. They don't do a strength test to determine the concrete strength at stripping, they've been doing it so long they "know" they have the strength to handle the units.
That's all I've found so far!