All,
I have a 200 kg/m3 (337#/yd3)concrete mix for 20 MPa (cube) - or 16 MPa cylinder requirement at 90 days (using 25% fly ash substitution). One of our batch plants is producing an average of 46 MPa (cube - or 37 MPa cylinder). This seems very high to me as a 300 kg/m3 (505#/yd3) mix is only producing 52 MPa (42 MPa).
Any thoughts - other than they picked up a 300 kg mix specimen for the 200 kg mix. We have fairly consistent results for over 500 samples. On another batch plant - same mix designs and same aggregates, we are getting 27 MPa (22 MPa) for the 200 kg mix.
Appreciate your thoughts on this - btw, the compression machine was calibrated in February and this does not seem to be the culprit . . .
I have a 200 kg/m3 (337#/yd3)concrete mix for 20 MPa (cube) - or 16 MPa cylinder requirement at 90 days (using 25% fly ash substitution). One of our batch plants is producing an average of 46 MPa (cube - or 37 MPa cylinder). This seems very high to me as a 300 kg/m3 (505#/yd3) mix is only producing 52 MPa (42 MPa).
Any thoughts - other than they picked up a 300 kg mix specimen for the 200 kg mix. We have fairly consistent results for over 500 samples. On another batch plant - same mix designs and same aggregates, we are getting 27 MPa (22 MPa) for the 200 kg mix.
Appreciate your thoughts on this - btw, the compression machine was calibrated in February and this does not seem to be the culprit . . .