We need to strike some formworks early and lift the concrete beams into place.
The concrete is standard 40N/mm2 concrete but it only needs to achieve 15N/mm2 for the lift.
Does anyone know what the equation is for the strength development curve, or have a reference for one?
Thanks
The concrete is standard 40N/mm2 concrete but it only needs to achieve 15N/mm2 for the lift.
Does anyone know what the equation is for the strength development curve, or have a reference for one?
Thanks