Does anyone has suggestions and checkpoints for concrete slab and rebar under fire.
I have participate in assesment of this slab for warehouse which damaged by fire( more than 4 hrs). This warehouse use for chemical raw material stocking. After fire the superstructure was demolished, but we trying to use or repair this slab.
existing slab was designed for 600 psf live load on pile which space 12 ft by 12 ft(flat slab). 8" thickness with no.4@8" top&bottom, bothways.By inspection concrete cover around 1" with concrete hardener surface. 5% of surface : concrete surface spall to top bars, 20% with minor spall off to depth around half inch(max).( total 60000 sft)
Verifying point;
- remaing capacity of this slab and long time service.
- What extent of damage to this concrete and rebars.
Thanks in advance.
I have participate in assesment of this slab for warehouse which damaged by fire( more than 4 hrs). This warehouse use for chemical raw material stocking. After fire the superstructure was demolished, but we trying to use or repair this slab.
existing slab was designed for 600 psf live load on pile which space 12 ft by 12 ft(flat slab). 8" thickness with no.4@8" top&bottom, bothways.By inspection concrete cover around 1" with concrete hardener surface. 5% of surface : concrete surface spall to top bars, 20% with minor spall off to depth around half inch(max).( total 60000 sft)
Verifying point;
- remaing capacity of this slab and long time service.
- What extent of damage to this concrete and rebars.
Thanks in advance.