Perhaps I'm doing it wrong (entirely likely) but I've always determined the required area for both the vertical and lateral component, proceeded to make them cubic based on the worst case side sizing required, and then double checked that the raker won't punch through the chunk of concrete (almost never governs unless you've got super strong soil properties).