If an increased load is applied to a concrete floor slab after the floor has been in use for 12 years or so, what is the creep factor that should be used to predict the additonal long term creep due to the additional load?
Can creep be essentailly ignored because the concrete is so old at the time of application of the additional load?
Can creep be essentailly ignored because the concrete is so old at the time of application of the additional load?