Please note that Westegaard's method is only valid for solid, monolithic, poured in place, formed, concrete slabs. It does not apply to precast plank, poured in place slabs over composite metal deck, grating, floor plate, one way concrete joists, etc.
The amount of reinforcement, placed at right angles to the main reinforcement (often called distribution steel), is very important and is generally more than the normal requirement for temperature and shrinkage steel. This steel is what helps the concentrated load(s) spread out over the effective width.