I am considering using a composite floor+wf beam system for a mechanical room . The roof for this area is nothing more than a trellis, so the floor itself is exposed to weather. Floor construction is 2" metal deck with 4.5" normal weight concrete (6.5" total) over WF composite steel beams.
I am thinking of adding an additional 1" of concrete as an extra cover (ignore in my calc). But would that be enough, would I need to do something additional with the concrete mix or should there be any sort of treatment over the finished floor? The area is going to be closed for the most part and is not supposed to be salted but I suspect that the maintenance guys would eventually have to go up there and would need to salt the floor occasionally.
I am thinking of adding an additional 1" of concrete as an extra cover (ignore in my calc). But would that be enough, would I need to do something additional with the concrete mix or should there be any sort of treatment over the finished floor? The area is going to be closed for the most part and is not supposed to be salted but I suspect that the maintenance guys would eventually have to go up there and would need to salt the floor occasionally.