oneintheeye
Structural
- Nov 20, 2007
- 440
I have a project with a precast slab placed and a concrete topping cast above. The precast acts as permanent formwork and also acts compositly with the topping slab (RC in both). The bottom precast element has a lattice of steel bars sticking out which bonds the topping slab to it. My question is on how to confirm the capacity of the slabs to act compositly before they fail at the boundary and so the load is taken by the precast (which will then fail I suppose). You might now this type of precast as omnia or omnidec. This is an assessment job of existing so I can't just ask the manufacturer to do it for me!