Hello,
I am currently designing a highway electrical supply with HV and LV grounds. I intend to make a common ground for both HV and LV. While examining CENELEC HD 637 S1, I have found it says that if LV loads are inside the area of HV ground, all grounds must be joined and the requisites for common grounding are automatically fulfilled.
Has anyone an explanation for this? Because I find the requisites hard to fulfill.
Thanks.
I am currently designing a highway electrical supply with HV and LV grounds. I intend to make a common ground for both HV and LV. While examining CENELEC HD 637 S1, I have found it says that if LV loads are inside the area of HV ground, all grounds must be joined and the requisites for common grounding are automatically fulfilled.