Lan123
Civil/Environmental
- Aug 27, 2010
- 155
Due to a potential conflict with a another utility provider I have to relocate an existing CAV and the vault. The CAV is at high point of a 16" ductile Iron water transmission pipeline. Can I relocate the CAV by installating a 16" "Tee" at the high point and then extending the branch of the tee horizontally for about 20' upto the proposed CAV location. Anyone has any prior experience with this type of an issue. Like to hear your experience.
Thanks.
Thanks.