NewbieStruct
Structural
- May 31, 2011
- 101
I have a project where a column pokes through a concrete floor(concrete over steel deck - 5.5 total thickness). It will have the concrete floor all around it. Does this qualify as a brace point ? The floor to floor height is 15' and the total height of column is 29'. Is the unbraced length 15' or 29'?