aladdin76
Civil/Environmental
- Dec 10, 2005
- 25
In a reinforced concrete buildings project, the contractor casted about 150 foundations with 6 ?14mm starter bars for the columns, at a later stage it was found that the reinforcement in some columns has to increased to 6 ?16mm, the first proposition was to add dowels by drilling and epoxy, then after consulting it was decided that the 6 ?16mm can be just added to overlap with the 6 ?14mm, I checked ACI 318 and ACI 315 and found nothing in regard??
Note : the foundations were designed as Fixed.
Note : the foundations were designed as Fixed.