amain002
Structural
- Aug 14, 2013
- 35
I have a question about rebar configuration for column which I am not familiar too so hope you guys could help me with this.
This is for a building with 1st floor SOG, 2nd floor slab, 3rd floor transfer slab and wood framing above.
Typically for concrete column, our detail shows rebar from the top of footing to the second floor (extended above slab for as required for lap) and from 2nd to 3rd floor slab. Now someone is asking that is it OK to run the column rebar from top of footing directly to 3rd floor slab without breaking it at each floor level.
I personally have only seen seen doing it the conventional way with rebar from floor level to floor level. Has anyone designed their columns in such a way and if so is there any codes regarding using such method.
Please share your ideas and if you recommend or do not recommend doing it so. Other than workability, are there any issues. Thank you for your help in advance.
This is for a building with 1st floor SOG, 2nd floor slab, 3rd floor transfer slab and wood framing above.
Typically for concrete column, our detail shows rebar from the top of footing to the second floor (extended above slab for as required for lap) and from 2nd to 3rd floor slab. Now someone is asking that is it OK to run the column rebar from top of footing directly to 3rd floor slab without breaking it at each floor level.
I personally have only seen seen doing it the conventional way with rebar from floor level to floor level. Has anyone designed their columns in such a way and if so is there any codes regarding using such method.
Please share your ideas and if you recommend or do not recommend doing it so. Other than workability, are there any issues. Thank you for your help in advance.