tbone73
Structural
- Apr 2, 2009
- 51
For the base plate to foundation connection at braced frame columns, what order of magnitude for tension do you consider significant enough to warrant a more robust connection than just anchor bolts and shear plates? I'm working on a project that has around 450 kips net uplift (ULT). I'm considering slightly recessing the column into the footing to transfer shear through bearing. For the large uplift I was thinking weld plates from the base plate to an embed plate. The embed plate would have welded rebar with hooks to fully develop the tension. Others in the office think this may require something even more robust. I appreciate your input in advance. Thanks.