I'm giving the architect estimate of size/gage for CF studs in a backup wall, eventually to be designed by others. The floor to floor is almost 15ft, so clear span of the studs is a little over 14ft. The jambs are about every 8.5ft on center.
- When looking at load path should I assume windows span vertically when sizing header and span horizontally when sizing jamb? i.e. take most conservative load path for each.
- At 14+ft the jambs appear to be very heavy. At what ga does it make sense to go to structural steel (say hss).
- When looking at load path should I assume windows span vertically when sizing header and span horizontally when sizing jamb? i.e. take most conservative load path for each.
- At 14+ft the jambs appear to be very heavy. At what ga does it make sense to go to structural steel (say hss).