PSP113
Chemical
- Nov 29, 2008
- 15
We have multiple wells in a relatively mature oil field. In the last year we set up a pilot project to inject C02 into the formation to get greater oil production. Within the last six months we've seen hydrate formation across the choke spools on our wells. This causes interuption in production and a headache for the operators. Anyone encountered this issue with increased CO2 levels and any thoughts on prevention, fixes?